Tailing Reduction Operations, Suncor

Tailing Reduction Operations, Suncor

HCS Focus is currently working on Suncor’s Tailing Reduction Operations (TRO) project.. Four crews are providing surveying services for the Tailings Reduction Operations, which is patented by Suncor. Tailings ponds are part of the mining production, but the new process reduces reclamation from 30 to 40 years to 7 to 10 years. This is a significant change to the way tailings ponds are designed and managed and reduces the overall footprint of the tailings pond. Focus is excited to be involved in the project by providing surveying services, including and congratulates Suncor on its exciting project.

Listed below are samples of the tasks we carry out on a regular basis on the TRO Project.
• Layout new pipeline R.O.W’s
• Toposurvey for volume calculations
• As-built existing P/L and pile locations for design of new R.O.W.
• As-built existing Tailings pumps and nozzles for new piping spools
• Layout of power poles and new substation locations
• Layout pipe(s) C/L on new R.O.W’s for pipe placement
• Layout berms, swales, and ditching.
• Layout monitoring well locations
• Calculate and layout battered pile locations for pipelines
• Set cutoff elevations and as-built piles
• Layout C/L’s and set support beams
• Design and layout roads
• Underground scanning for excavation permits
 

Tailing Reduction Operations, Suncor
Tailing Reduction Operations
HCS Focus is currently working on Suncor’s Tailing Reduction Operations (TRO) project.. Four crews are providing surveying services for the Tailings Reduction Operations, which is patented by Suncor.